References
Read more about our ongoing and executed projects
High quality solutions and satisfied clients
Take a look and read more about our previous and ongoing projects. Get an insight into our project roles, partnerships, and our work through the years.
Fornebubanen
Railways
Concrete Structures fulfilled the role of technical expert for all railway stations, concrete, and steel structures along the entire route from Majorstua station to Fornebu base station.
Read more about this project here.
New Radium Hospital
Cancer hospital
Concrete Structures fulfilled the role of construction lead for the Radium Hospital’s Proton Therapy building and for overseeing the client’s requirements, particularly with regards to specially designed concrete for radiation treatment facility.
Read more about this project here.
Hugin A and Hugin B
Jacket structure for oil and gas
Concrete Structures AS participated in the Marine Operations group at Aker Solutions Jacket Technology, responsible for marine and structural analysis of loadout, transport, and lifting operations for the Hugin A and Hugin B jackets in the Yggdrasil project for Aker BP.
Read more about this project here.
Valhall PWP - Fenris
Jacket structure for oil and gas
Concrete Structures AS participated in the design group at Aker Solutions Jacket Technology, responsible for structural analysis of the Valhall and Fenris jackets in the Valhall PWP - Fenris project for Aker BP
Read more about this project here.
Empire Feed
Fixed concrete substructure for windmills in the ocean
Concrete Structures AS participated in the civil design group at Aker Solutions, with responsibilites as Concept Advisor and Civil Design Lead.
Read more about this project here.
Hywind Tampen | Detail design
Floating concrete substructure for windmills
"Hywind Tampen: the world’s first renewable power for offshore oil and gas", (Equinor)
Concrete Structures AS was responsible for majority of the key roles in the concrete design of the Hywind Tampen substructures for Aker Solutions.
Read more about the project here.
Arctic LNG2
Gravity based LNG Terminal
Concrete Structures AS was engaged in Novatec Arctics LNG2 project. This is one of the largest projects in an arctic environment ever performed.
Read more about the Arctic LNG 2 project here.
Read more about the project in The Barents Observer
Follo Line – EPC Ski
Railway station
Bane NOR
May 2017
Concrete Structures AS fulfilled the role of the client’s technical manager for the follow-up of all structural engineering constructions at Ski station.
Read more about the project here.
Myrvoll Station
Commercial building
Detail Engineering
JM Norge AS – Sweco
August 2017 – May 2018
Concrete Structures AS fulfilled the role of Engineering Manager for Torgkvartalet.
Biterudhagen
Residential building
Detail Engineering
Axer Eiendom AS – Sweco
April 2017 – February 2018
Concrete Structures AS fulfilled the role of Project Manager.
Midtre Romerike Avløpsselskap – MIRA IKS – Sweco
New wastewater treatment plant in Sørum municipality
MIRA IKS – Sweco
April 2016 – November 2016
Concrete Structures AS fulfilled the role of Construction Manager. Read more about the project here.
ØyMerd™
Floating concrete fish farm
Concept development, phase 1 and phase 2
Bemlotek AS
January 2015 – July 2018
Concrete Structures AS was responsible for all technical design.
Hebron GBS Project
Gravity based platform including storage for oil and gas
Design follow-up
Kiewit – Kvaerner – Exxon Mobil
December 2014 – August 31st, 2017
Concrete Structures AS fulfilled most of the key roles around follow-up on this project. Read more about the Hebron-project
Detail Design
Kiewit – Kvaerner – Exxon Mobil
April 2012 – November 28th, 2014
Concrete Structures AS fulfilled most of the key roles around concrete design and interface on this project.
FEED (Front End Engineering and Design)
Kiewit – Kvaerner – Exxon Mobil
FEED completed.
Building of design team in St. John’s, autumn 2011/winter 2012, completed. Concrete Structures AS fulfilled key roles and leadership on this project
lenker:
Sakhalin 1 Arkutun Dagi – GBS DE
Gravity based platform for oil and gas
Aker Engineering & Technology AS – Exxon Mobil
Concrete Structures fulfilled several key roles as Engineering Manager, Civil Engineering Manager, Project Manager, Interface Coordinator and Design Group Leads. Read more about the Sakhalin project here.